Course of Construction Inspections

Mitigate risk and ensure a quality product

Pacific InterWest’s on-site construction progress inspections are performed by PIW’s ICC-certified inspectors to the requirements for third-party inspectors as prescribed in California Civil Code Title 7, Section 43.99. SB800 affords confidentiality between the developer and the third-party inspection firm, so the inspection reports can be detailed and thorough, allowing maximum effective QA/QC benefit.

Inspections are made at the following building stages:

  • Pre-Construction Job Kickoff and Phase Meetings
  • Below-Grade Waterproofing
  • Foundation and Vapor Barrier
  • Framing Exterior (Sheath and Shear)
  • Pre-Wrap Waterproofing
  • Podium or Pool Waterproofing
  • Building Envelope (Walls)
  • Lumber Moisture Certification
  • MEP (Mechanical, Electrical, Plumbing)
  • Framing (Interior)
  • Fire and Sound
  • Gyp-Crete
  • Balcony Waterproofing
  • Roof Deck Waterproofing
  • Roof Dry-in and Finish (Ground- or Aerial-based)
  • HouseReady Inspections
  • Random ‘Back Check’ Reinspections
PIW inspectors at construction jobsite
Building covered with scaffolding under construction
aerial view of rooftop after dry in with finish materials stacked on roof
Pacific InterWest Building Consultants logo

MSIRobot